Roads, bridges, ports, rail and utilities — long programmes, multiple packages and a heavy documentation burden.
Overview
Fortis Sync on infrastructure programmes
Infrastructure work runs for years, spans several contractors and joint ventures, and generates a documentation load that a folder structure cannot survive. The record has to be complete not because anyone enjoys paperwork but because entitlement on a five-year programme is decided by contemporaneous evidence.
Fortis Sync maintains the correspondence, instructions and progress records that an extension of time claim is built from, and links them to the activities they affected — so substantiation is assembled from what was recorded at the time rather than reconstructed afterwards.
- FIDIC, NEC and bespoke contract forms
- Local authority submission workflows
- Sector inspection and NCR templates
- Multi-package and joint-venture structures
What matters in this sector
Where Fortis Sync makes the difference
Multi-package control
Separate packages and joint-venture parties working to one shared register.
EOT substantiation
Delay events linked to programme activities as they happen, not months later.
Authority compliance
Submission workflows configured to the approving authority for each discipline.