Real-Time Site Progress

What happens on site reaches the project office as it happens.

Overview

Close the gap between the site and the office

Fortis Sync captures real-time site progress using wireless technology, pushing updates straight to the project office. Photos, videos, manhours and installation dates are recorded by floor and by room as the work is done.

Resource utilisation and performance KPIs are monitored continuously, and graphical insight analyses project performance by floor, room or zone. Smart devices on site always hold the current drawing revision.

  • Instant updates: photos, videos, manhours, dates
  • Progress recorded by floor, room and zone
  • Resource utilisation and performance KPIs
  • Smart devices always on the current drawing
Real-Time Site Progress
Real-Time Site ProgressWhat happens on site reaches the project office as it happens.

Capabilities

What sits inside this platform

Wireless site capture

Field updates sent from site to the project office as they happen, without waiting for anyone to return to a desk.

Floor, room and zone

Progress is recorded against real locations, so percentage complete means something specific rather than an estimate.

Performance KPIs

Resource utilisation and productivity tracked continuously and analysed graphically by area.

Programme linkage

Actual progress compared against baseline, feeding straight into delay analysis and EOT substantiation.

Current drawings on site

Smart devices always carry the latest revision, which removes an entire category of rework.

Manhours and dates

Installation dates and manhours captured at the point of work, giving a defensible basis for valuation and claims.

Benefits

Why it matters on site

No reporting lag

The project office knows where the job is today, not where it was at the last progress meeting.

Productivity visible

Utilisation and output are measured by area, so underperformance is identified where it occurs.

Rework reduced

Nobody builds to a superseded drawing when every device on site holds the current revision.

Valuation supported

Manhours and installation dates recorded at source give the commercial team a defensible position.

See progress the day it happens