Which drawing goes to site? A revision check for Dubai fit-out teams
On a Dubai apartment fit-out, a supervisor has marked the bathroom door opening from a printed plan. The joinery contractor has a newer PDF on a phone. The two dimensions differ. Before either crew moves the frame, the package manager needs to answer two questions: which revision is approved for this room, and who received it?
Start with the room and the drawing status
A drawing revision check starts at the workface. Record the tower, level, unit type and drawing number printed on the sheet. Open the register and check the latest revision approved for construction for that location. A later issue may still be under review. If its status or applicability is unclear, ask the authorised issuer to resolve the discrepancy before releasing the affected work.
Identify exactly what the change touches
Compare the two revisions at the doorway. A moved opening can affect the frame order, switch position and tile setting-out. Mark the changed dimension on the relevant revision and identify the trades that use it. In Fortis Sync Drawings, teams can compare revisions and keep each markup attached to the sheet it describes.
Follow the issue to the crew
Use the transmittal to check which revision went to each recipient and when. Then ask the foreman to show the copy the installer will use. A transmittal can establish delivery to the subcontractor’s office while an earlier print is still pinned beside the unit entrance. Replace that print and retain the superseded issue in the register for the project record.
At the next shift handover, ask the incoming supervisor to point to the door detail, state its revision and identify the affected units. If the supervisor can do all three, the team has a practical basis for releasing that package.
Keep reading
More from Fortis Sync

How to review open variations before an Abu Dhabi project cost meeting
A revised lobby layout arrives just before the monthly cost meeting on an Abu Dhabi office project. The partition contractor has priced…
Read more
Before the ceiling closes: a 360° capture route for Dubai MEP teams
When a ceiling contractor asks which bays can close tonight, a folder of site photographs can leave the MEP coordinator with an…
Read more
How Abu Dhabi project teams can close procurement actions in weekly meetings
“Supplier to follow up” can survive several sets of meeting minutes while the installation date gets closer. A procurement action review gives…
Read more